Line 7 Info
- Network Shenzhen Metro
- Operation Started 2016
- Total Length 30.2 km
- Total Stations 28
Terminals
From
Xili Lake
To
Tai'an
Line 7 Overview
The first phase of Line 7 opened on October 28, 2016, between Xili Lake and Tai'an. The line was subsequently expanded in phases, and in 2024, the line extended westward to reach the SZU Lihu Campus. It connects the SZU Lihu Campus to Tai'an and runs in a "V" shape in an east-west direction in Shenzhen. It is 32.8 kilometers long and has 29 stations. It includes major interchanges such as Chegongmiao, Huaqiang North, Huangmugang, and Tai'an.
Shenzhen Metro Map 2026
Click to expand
Other Lines in Shenzhen Metro
Line 1
Luohu ↔ Airport East
30 stations
Line 10
Shuangyong Street ↔ Futian Checkpoint
24 stations
Line 11
Bitou ↔ Gangxia North
19 stations
Line 12
Zuopaotai East ↔ Waterlands Resort East
33 stations
Line 14
Gangxia North ↔ Shatian
18 stations
Line 16
Universiade ↔ Tianxin
24 stations
Line 2
Chiwan ↔ Liantang
32 stations
Line 20
Convention & Exhibition City ↔ Airport North
5 stations
Line 3
Futian Bonded Area ↔ Shuanglong
31 stations
Line 4
Futian Checkpoint ↔ Niuhu
23 stations
Line 5
Chiwan ↔ Huangbeiling
34 stations
Line 6
Songgang ↔ Science Museum
27 stations
Frequently Asked Questions — Line 7
Line 7 has 28 stations on the Shenzhen Metro network.
Line 7 runs between Xili Lake and Tai'an.
Line 7 is approximately 30.2 km long.
Line 7 opened in 2016.
Line 7 is a Metro line operated under Shenzhen Metro.
Line 7 is part of the Shenzhen Metro transit network.