Line 11 Info
- Network Shenzhen Metro
- Operation Started 2016
- Total Length 53.1 km
- Total Stations 19
Terminals
From
Bitou
To
Gangxia North
Line 11 Overview
Line 11 began operation on June 28, 2016, between Bitou and Hongling South. The line was constructed in several phases and will later be extended eastward to Hongling South by 2024–2025. The line is 58 kilometers long and has 22 stations. It is a high-speed metro line designed for faster travel with fewer stops than other lines, and connects major commercial areas directly to the airport.
Shenzhen Metro Map 2026
Click to expand
Other Lines in Shenzhen Metro
Line 1
Luohu ↔ Airport East
30 stations
Line 10
Shuangyong Street ↔ Futian Checkpoint
24 stations
Line 12
Zuopaotai East ↔ Waterlands Resort East
33 stations
Line 14
Gangxia North ↔ Shatian
18 stations
Line 16
Universiade ↔ Tianxin
24 stations
Line 2
Chiwan ↔ Liantang
32 stations
Line 20
Convention & Exhibition City ↔ Airport North
5 stations
Line 3
Futian Bonded Area ↔ Shuanglong
31 stations
Line 4
Futian Checkpoint ↔ Niuhu
23 stations
Line 5
Chiwan ↔ Huangbeiling
34 stations
Line 6
Songgang ↔ Science Museum
27 stations
Line 6B
SIAT ↔ Guangming
4 stations
Frequently Asked Questions — Line 11
Line 11 has 19 stations on the Shenzhen Metro network.
Line 11 runs between Bitou and Gangxia North.
Line 11 is approximately 53.1 km long.
Line 11 opened in 2016.
Line 11 is a Metro line operated under Shenzhen Metro.
Line 11 is part of the Shenzhen Metro transit network.