Line 10 Info
- Network Shenzhen Metro
- Operation Started 2020
- Total Length 29.3 km
- Total Stations 24
Terminals
From
Shuangyong Street
To
Futian Checkpoint
Line 10 Overview
Line 10 opened on August 18, 2020, between Futian Checkpoint and Shuangyong Street. This line was built as part of Shenzhen's Phase 3 Metro Expansion Project and is operated by Shenzhen Metro Group. It is 29.3 kilometers long and has 24 stations. It includes major interchanges such as Futian Checkpoint, Gangxia North, Lianhuacun, and Wuhe.
Shenzhen Metro Map 2026
Click to expand
Other Lines in Shenzhen Metro
Line 1
Luohu ↔ Airport East
30 stations
Line 11
Bitou ↔ Gangxia North
19 stations
Line 12
Zuopaotai East ↔ Waterlands Resort East
33 stations
Line 14
Gangxia North ↔ Shatian
18 stations
Line 16
Universiade ↔ Tianxin
24 stations
Line 2
Chiwan ↔ Liantang
32 stations
Line 20
Convention & Exhibition City ↔ Airport North
5 stations
Line 3
Futian Bonded Area ↔ Shuanglong
31 stations
Line 4
Futian Checkpoint ↔ Niuhu
23 stations
Line 5
Chiwan ↔ Huangbeiling
34 stations
Line 6
Songgang ↔ Science Museum
27 stations
Line 6B
SIAT ↔ Guangming
4 stations
Frequently Asked Questions — Line 10
Line 10 has 24 stations on the Shenzhen Metro network.
Line 10 runs between Shuangyong Street and Futian Checkpoint.
Line 10 is approximately 29.3 km long.
Line 10 opened in 2020.
Line 10 is a Metro line operated under Shenzhen Metro.
Line 10 is part of the Shenzhen Metro transit network.