Line 5 Info
- Network Shenzhen Metro
- Operation Started 2011
- Total Length 47.4 km
- Total Stations 34
Terminals
From
Chiwan
To
Huangbeiling
Line 5 Overview
Line 5 opened on June 22, 2011, with the initial section between Qianhaiwan and Huangbeiling. The line was subsequently expanded in phases, including a southern extension from Qianhaiwan to Chiwan in 2019 and a western extension to Grand Theatre in 2025, completing the entire route. It is 47.4 km long and has 37 stations. The line serves major interchange stations such as Qianhaiwan, Shenzhen North Railway Station, and Huangbeiling.
Shenzhen Metro Map 2026
Click to expand
Other Lines in Shenzhen Metro
Line 1
Luohu ↔ Airport East
30 stations
Line 10
Shuangyong Street ↔ Futian Checkpoint
24 stations
Line 11
Bitou ↔ Gangxia North
19 stations
Line 12
Zuopaotai East ↔ Waterlands Resort East
33 stations
Line 14
Gangxia North ↔ Shatian
18 stations
Line 16
Universiade ↔ Tianxin
24 stations
Line 2
Chiwan ↔ Liantang
32 stations
Line 20
Convention & Exhibition City ↔ Airport North
5 stations
Line 3
Futian Bonded Area ↔ Shuanglong
31 stations
Line 4
Futian Checkpoint ↔ Niuhu
23 stations
Line 6
Songgang ↔ Science Museum
27 stations
Line 6B
SIAT ↔ Guangming
4 stations
Frequently Asked Questions — Line 5
Line 5 has 34 stations on the Shenzhen Metro network.
Line 5 runs between Chiwan and Huangbeiling.
Line 5 is approximately 47.4 km long.
Line 5 opened in 2011.
Line 5 is a Metro line operated under Shenzhen Metro.
Line 5 is part of the Shenzhen Metro transit network.