Line 7 Info
- Network Beijing Subway
- Operation Started 2014
- Total Length 40.3 km
- Total Stations 30
Terminals
From
Beijing West railway station
To
Universal Resort
Line 7 Overview
The first phase of Beijing Metro Line 7 opened on December 28, 2014, between Beijing West Railway Station and Jiaohuachang. The line was extended to Huazhuang in phases, covering a length of approximately 40 km and having 30 stations. It runs east-west through southern Beijing and includes major interchange stations such as Beijing West Railway Station, Ciqikou, and Dajiaoting.
Beijing Subway Map 2026
Click to expand
Other Lines in Beijing Subway
Capital Airport Line
Beixinqiao ↔ 2 Hao Hangzhanlou (Terminal 2)
5 stations
Changping Line
Changping Xishankou ↔ Jimenqiao
20 stations
Daxing Airport Line
Lize Shangwuqu ↔ Daxing Jichang (Daxing Airport)
4 stations
Fangshan Line
Dongguantounan ↔ Yancundong
16 stations
Line 1 (Batong)
Fushouling ↔ Universal Resort
37 stations
Line 10
Bagou ↔ Huoqiying
45 stations
Line 11
Moshikou ↔ Xinshougang (Shougang Park)
4 stations
Line 13
Xizhimen ↔ Dongzhimen
17 stations
Line 14
Zhangguozhuang ↔ Shangezhuang
36 stations
Line 15
Qinghua Donglu Xikou ↔ Fengbo
20 stations
Line 16
Bei'anhe ↔ Wanpingcheng
30 stations
Line 17
Future Science City North ↔ Jiahuihu
21 stations
Frequently Asked Questions — Line 7
Line 7 has 30 stations on the Beijing Subway network.
Line 7 runs between Beijing West railway station and Universal Resort.
Line 7 is approximately 40.3 km long.
Line 7 opened in 2014.
Line 7 is a Metro line operated under Beijing Subway.
Line 7 is part of the Beijing Subway transit network.