Line 15 Info
- Network Beijing Subway
- Operation Started 2010
- Total Length 41.4 km
- Total Stations 20
Terminals
From
Qinghua Donglu Xikou
To
Fengbo
Line 15 Overview
The first phase of Beijing Metro Line 15 opened on December 30, 2010, between Wangjing West and Houxiu. The line was extended eastward to Fengbo in phases, and the first corridor entered full operation on December 30, 2011. The line is 41.4 km long, with 20 stations, and includes key interchange stations such as Wangjingxi and Olympic Green.
Beijing Subway Map 2026
Click to expand
Other Lines in Beijing Subway
Capital Airport Line
Beixinqiao ↔ 2 Hao Hangzhanlou (Terminal 2)
5 stations
Changping Line
Changping Xishankou ↔ Jimenqiao
20 stations
Daxing Airport Line
Lize Shangwuqu ↔ Daxing Jichang (Daxing Airport)
4 stations
Fangshan Line
Dongguantounan ↔ Yancundong
16 stations
Line 1 (Batong)
Fushouling ↔ Universal Resort
37 stations
Line 10
Bagou ↔ Huoqiying
45 stations
Line 11
Moshikou ↔ Xinshougang (Shougang Park)
4 stations
Line 13
Xizhimen ↔ Dongzhimen
17 stations
Line 14
Zhangguozhuang ↔ Shangezhuang
36 stations
Line 16
Bei'anhe ↔ Wanpingcheng
30 stations
Line 17
Future Science City North ↔ Jiahuihu
21 stations
Line 19
Mudanyuan ↔ Xingong
10 stations
Frequently Asked Questions — Line 15
Line 15 has 20 stations on the Beijing Subway network.
Line 15 runs between Qinghua Donglu Xikou and Fengbo.
Line 15 is approximately 41.4 km long.
Line 15 opened in 2010.
Line 15 is a Metro line operated under Beijing Subway.
Line 15 is part of the Beijing Subway transit network.