Changping Line Info
- Network Beijing Subway
- Operation Started 2010
- Total Length 43.2 km
- Total Stations 20
Terminals
From
Changping Xishankou
To
Jimenqiao
Changping Line Overview
The first phase of the Changping Line opened on December 30, 2010, between Xi'erqi and Nanshao. The line was later extended northward in phases to Changping Shishankou, with the second phase opening on December 26, 2015. The southern extension toward central Beijing was completed in several sections between 2021 and 2024. It is 43.8 km long and has 20 stations. It runs through Changping District to northern Beijing, connecting to Line 13 and Line 8.
Beijing Subway Map 2026
Click to expand
Other Lines in Beijing Subway
Capital Airport Line
Beixinqiao ↔ 2 Hao Hangzhanlou (Terminal 2)
5 stations
Daxing Airport Line
Lize Shangwuqu ↔ Daxing Jichang (Daxing Airport)
4 stations
Fangshan Line
Dongguantounan ↔ Yancundong
16 stations
Line 1 (Batong)
Fushouling ↔ Universal Resort
37 stations
Line 10
Bagou ↔ Huoqiying
45 stations
Line 11
Moshikou ↔ Xinshougang (Shougang Park)
4 stations
Line 13
Xizhimen ↔ Dongzhimen
17 stations
Line 14
Zhangguozhuang ↔ Shangezhuang
36 stations
Line 15
Qinghua Donglu Xikou ↔ Fengbo
20 stations
Line 16
Bei'anhe ↔ Wanpingcheng
30 stations
Line 17
Future Science City North ↔ Jiahuihu
21 stations
Line 19
Mudanyuan ↔ Xingong
10 stations
Frequently Asked Questions — Changping Line
Changping Line has 20 stations on the Beijing Subway network.
Changping Line runs between Changping Xishankou and Jimenqiao.
Changping Line is approximately 43.2 km long.
Changping Line opened in 2010.
Changping Line is a Metro line operated under Beijing Subway.
Changping Line is part of the Beijing Subway transit network.