Line 14 Info
- Network Beijing Subway
- Operation Started 2013
- Total Length 47.3 km
- Total Stations 36
Terminals
From
Zhangguozhuang
To
Shangezhuang
Line 14 Overview
The first phase of Beijing Metro Line 14 opened on May 5, 2013, between Zhangguozhuang and Shizhu. The line was expanded in several phases, with the eastern section opening between 2014 and 2017, and the central section completed on December 31, 2021. The line is 47.3 km long and has 36 stations. It runs on an L-shaped route across southern and eastern Beijing and includes major interchanges such as Beijing South Railway Station, Shilihe, and Wangjing.
Beijing Subway Map 2026
Click to expand
Other Lines in Beijing Subway
Capital Airport Line
Beixinqiao ↔ 2 Hao Hangzhanlou (Terminal 2)
5 stations
Changping Line
Changping Xishankou ↔ Jimenqiao
20 stations
Daxing Airport Line
Lize Shangwuqu ↔ Daxing Jichang (Daxing Airport)
4 stations
Fangshan Line
Dongguantounan ↔ Yancundong
16 stations
Line 1 (Batong)
Fushouling ↔ Universal Resort
37 stations
Line 10
Bagou ↔ Huoqiying
45 stations
Line 11
Moshikou ↔ Xinshougang (Shougang Park)
4 stations
Line 13
Xizhimen ↔ Dongzhimen
17 stations
Line 15
Qinghua Donglu Xikou ↔ Fengbo
20 stations
Line 16
Bei'anhe ↔ Wanpingcheng
30 stations
Line 17
Future Science City North ↔ Jiahuihu
21 stations
Line 19
Mudanyuan ↔ Xingong
10 stations
Frequently Asked Questions — Line 14
Line 14 has 36 stations on the Beijing Subway network.
Line 14 runs between Zhangguozhuang and Shangezhuang.
Line 14 is approximately 47.3 km long.
Line 14 opened in 2013.
Line 14 is a Metro line operated under Beijing Subway.
Line 14 is part of the Beijing Subway transit network.