Line 5 Info
- Network Beijing Subway
- Operation Started 2007
- Total Length 27.6 km
- Total Stations 23
Terminals
From
Tiantongyuanbei
To
Songjiazhuang
Line 5 Overview
Beijing Subway Line 5 opened for public service on October 7, 2007. This line runs north-south from Tiangongyuan North to Songjiazhuang, covering 27.6 km and having 23 stations. It passes through central Beijing and includes major interchange stations such as Dongdan, Yonghegong Lama Temple, and Ciqikou.
Beijing Subway Map 2026
Click to expand
Other Lines in Beijing Subway
Capital Airport Line
Beixinqiao ↔ 2 Hao Hangzhanlou (Terminal 2)
5 stations
Changping Line
Changping Xishankou ↔ Jimenqiao
20 stations
Daxing Airport Line
Lize Shangwuqu ↔ Daxing Jichang (Daxing Airport)
4 stations
Fangshan Line
Dongguantounan ↔ Yancundong
16 stations
Line 1 (Batong)
Fushouling ↔ Universal Resort
37 stations
Line 10
Bagou ↔ Huoqiying
45 stations
Line 11
Moshikou ↔ Xinshougang (Shougang Park)
4 stations
Line 13
Xizhimen ↔ Dongzhimen
17 stations
Line 14
Zhangguozhuang ↔ Shangezhuang
36 stations
Line 15
Qinghua Donglu Xikou ↔ Fengbo
20 stations
Line 16
Bei'anhe ↔ Wanpingcheng
30 stations
Line 17
Future Science City North ↔ Jiahuihu
21 stations
Frequently Asked Questions — Line 5
Line 5 has 23 stations on the Beijing Subway network.
Line 5 runs between Tiantongyuanbei and Songjiazhuang.
Line 5 is approximately 27.6 km long.
Line 5 opened in 2007.
Line 5 is a Metro line operated under Beijing Subway.
Line 5 is part of the Beijing Subway transit network.