Pujiang Line Info
- Network Shanghai Metro
- Operation Started 2018
- Total Length 6.7 km
- Total Stations 6
Terminals
From
Shendu Highway
To
Huizhen Road
Pujiang Line Overview
The Pujiang Line was originally planned as the third phase of Line 8, but was later developed as a separate line and connects to Line 8 at Shendu Highway Station. The line runs between Shendu Highway and Huizhen Road. It is 6.7 kilometers long and has six stations. The Pujiang Line is the first fully automated, driverless metro line in the Shanghai Metro network and operates automatic passenger trains with rubber tires.
Shanghai Metro Map 2026
Click to expand
Other Lines in Shanghai Metro
Line 1
Xinzhuang ↔ Fujin Road
28 stations
Line 10
Hongqiao Railway Station ↔ Jilong Road
37 stations
Line 10
Hangzhong Road ↔ Xinjiangwancheng
27 stations
Line 11
Disney Resort ↔ Huaqiao
40 stations
Line 11
Disney Resort ↔ North Jiading
33 stations
Line 12
Qixin Road ↔ Jinhai Road
32 stations
Line 13
Jinyun Road ↔ Zhangjiang Road
31 stations
Line 14
Fengbang ↔ Guiqiao Road
31 stations
Line 15
Gucun Park ↔ Zizhu Hi-tech Park
30 stations
Line 16
Longyang Road ↔ Dishui Lake
13 stations
Line 17
Hongqiao Railway Station ↔ Oriental Land
13 stations
Line 18
South Changjiang Road ↔ Hangtou
26 stations
Frequently Asked Questions — Pujiang Line
Pujiang Line has 6 stations on the Shanghai Metro network.
Pujiang Line runs between Shendu Highway and Huizhen Road.
Pujiang Line is approximately 6.7 km long.
Pujiang Line opened in 2018.
Pujiang Line is a Metro line operated under Shanghai Metro.
Pujiang Line is part of the Shanghai Metro transit network.