Line 7 Info
- Network Nanjing Metro
- Operation Started 2022
- Total Length 24.5 km
- Total Stations 27
Terminals
From
Xianxinlu
To
Xishanqiao
Line 7 Overview
Line 7 of the Nanjing Metro began construction on 29 November 2017 and opened in phases starting from 28 December 2022. The northern section (from Xianxinlu to Mufuxilu) will open in 2022, followed by the southern section (from Yingtiandajie to Xishanqiao) in 2023, and the middle section in December 2024. The line is approximately 35.7 kilometers long and has a total of 27 stations.
Nanjing Metro Map 2026
Click to expand
Other Lines in Nanjing Metro
Line 1
Baguazhoudaqiaonan ↔ CPU
32 stations
Line 10
Olympic Stadium ↔ Yuantong
12 stations
Line 2
Yuzui ↔ Jingtianlu
30 stations
Line 3
Linchang ↔ Mozhoudonglu
29 stations
Line 4
Longjiang ↔ Xianlinhu
18 stations
S1 Line
Nanjing South Railway Station ↔ Konggangxinchengjiangning
9 stations
S3 Line
Changjiangdaqiaobei ↔ Jinniuhu
19 stations
S4 Line
Chuzhou Railway Station ↔ Nanjing North Railway Station
17 stations
S6 Line
Maqun ↔ Jurong
13 stations
S7 Line
Konggangxinchengjiangning ↔ Wuxiangshan
9 stations
S8 Line
Changjiangdaqiaobei ↔ Jinniuhu
19 stations
S9 Line
Xiangyulunan ↔ Gaochun
6 stations
Frequently Asked Questions — Line 7
Line 7 has 27 stations on the Nanjing Metro network.
Line 7 runs between Xianxinlu and Xishanqiao.
Line 7 is approximately 24.5 km long.
Line 7 opened in 2022.
Line 7 is a Metro line operated under Nanjing Metro.
Line 7 is part of the Nanjing Metro transit network.