Line 1 Info
- Network Nanjing Metro
- Operation Started 2005
- Total Length 45.4 km
- Total Stations 32
Terminals
From
Baguazhoudaqiaonan
To
CPU
Line 1 Overview
Line 1 of the Nanjing Metro opened on September 3, 2005, and has been subsequently extended, including a major southern extension in 2010 and a northern extension in 2022. This line runs between Baguazhouda Qiaonan and China Pharmaceutical University (CPU). It is approximately 45.4 kilometers long and has 32 stations. The route runs in a north-south direction and passes through major districts such as Qixia, Gulou, Qinhuai, and Jiangning.
Nanjing Metro Map 2026
Click to expand
Other Lines in Nanjing Metro
Line 10
Olympic Stadium ↔ Yuantong
12 stations
Line 2
Yuzui ↔ Jingtianlu
30 stations
Line 3
Linchang ↔ Mozhoudonglu
29 stations
Line 4
Longjiang ↔ Xianlinhu
18 stations
Line 7
Xianxinlu ↔ Xishanqiao
27 stations
S1 Line
Nanjing South Railway Station ↔ Konggangxinchengjiangning
9 stations
S3 Line
Changjiangdaqiaobei ↔ Jinniuhu
19 stations
S4 Line
Chuzhou Railway Station ↔ Nanjing North Railway Station
17 stations
S6 Line
Maqun ↔ Jurong
13 stations
S7 Line
Konggangxinchengjiangning ↔ Wuxiangshan
9 stations
S8 Line
Changjiangdaqiaobei ↔ Jinniuhu
19 stations
S9 Line
Xiangyulunan ↔ Gaochun
6 stations
Frequently Asked Questions — Line 1
Line 1 has 32 stations on the Nanjing Metro network.
Line 1 runs between Baguazhoudaqiaonan and CPU.
Line 1 is approximately 45.4 km long.
Line 1 opened in 2005.
Line 1 is a Metro line operated under Nanjing Metro.
Line 1 is part of the Nanjing Metro transit network.