Chengjiao Line Info
- Network Zhengzhou Metro
- Operation Started 2017
- Total Length 40.8 km
- Total Stations 27
Terminals
From
Chang'an Lu Bei
To
Xuchangdong
Chengjiao Line Overview
The Chengjiao Line is a suburban metro line with a total length of 31.7 kilometers, starting from Nansihuan in Guancheng and ending at Xinzheng International Airport, with 14 stations. The line opened on January 12, 2017. It connects the city with Longhu Town, Zhengzhou Airport Economy Zone, and Zhengzhou Xinzheng International Airport. Trains on this line currently run with Line 2. Important interchange stations include Nansihuan (Line 2) and Guangxu North (Zhengxu Line).
Zhengzhou Metro Map 2026
Click to expand
Other Lines in Zhengzhou Metro
Line 1
Henan University of Technology ↔ New Campus of Henan University
30 stations
Line 10
Zhengzhouxi Railway Station ↔ Zhengzhou Railway Station
12 stations
Line 12
Lianghu ↔ Longzihu Dong
11 stations
Line 14
Tielu ↔ Lianhu
4 stations
Line 2
Jiahe ↔ Nansihuan
22 stations
Line 3
Henan Sports Center ↔ Binhe Xincheng Nan
25 stations
Line 4
Laoyachen ↔ Langzhuang
27 stations
Line 5
Yuejigongyuan ↔ Wuyigongyuan
32 stations
Line 6
Jiayu ↔ Changzhuang
10 stations
Zhengxu Line
Shibalihe ↔ Zhengzhou Hangkonggang Railway Station
18 stations
Frequently Asked Questions — Chengjiao Line
Chengjiao Line has 27 stations on the Zhengzhou Metro network.
Chengjiao Line runs between Chang'an Lu Bei and Xuchangdong.
Chengjiao Line is approximately 40.8 km long.
Chengjiao Line opened in 2017.
Chengjiao Line is a Metro line operated under Zhengzhou Metro.
Chengjiao Line is part of the Zhengzhou Metro transit network.