Tianjin Metro Line 10
| Network | Tianjin Metro |
| Line | Line 10 |
| Line length | 21.18 |
| Opening date | 18 November 2022 |
| Line type | Rapid transit |
| Total station | 23 Active Stations |
| Terminals | Yutai ⇄ Yutai |
Stations
| Station | Layout | Operation starts | |
|---|---|---|---|
| ▣ | Yutai | ||
| ▣ | Yaohuanlu | ||
| ▣ | Changlinglu | ||
| ▣ | Lijiangdao | ||
| ▣ | Jiangwanerzhilu | ||
| ▣ | Youyinanlu | ||
| ▣ | Nanzhuqiao | ||
| ▣ | Chunhailu | ||
| ▣ | Magangchang | ||
| ▣ | Weishanlu | ||
| ▣ | Caijingdaxue | ||
| ▣ | Liulinlu | ||
| ▣ | Huanyudao | ||
| ▣ | Longhandao | ||
| ▣ | Jinmaochanyeyuan | ||
| ▣ | Fangshandao | ||
| ▣ | Shaliunanlu | ||
| ▣ | Wanshandao | ||
| ▣ | Xiangshandao | ||
| ▣ | Laoshandao | ||
| ▣ | Yudongcheng | ||
| ▣ | Lushandao | ||
| ▣ | Nandian | ||
Metro Map
Other Lines
| Metro lines | Stations | Terminal stations | |
|---|---|---|---|
| ▣ | Line 1 | 30 | Donggulu ⇄ Liuyuan |
| ▣ | Line 2 | 20 | Caozhuang ⇄ Binhaiguojijichang |
| ▣ | Line 3 | 26 | Xiaodian ⇄ Nanzhan |
| ▣ | Line 4 | 14 | Dongnanjiao ⇄ Xinxingcun |
| ▣ | Line 5 | 28 | Beichenkejiyuanbei ⇄ Liqizhuangnan |
| ▣ | Line 6 | 40 | Nansunzhuang ⇄ Lushuidao |
| ▣ | Line 8 | 9 | Lushuidao ⇄ Xianshuiguxi |
| ▣ | Line 9 | 22 | Tianjinzhan ⇄ Donghailu |
| ▣ | Line 11 | 11 | Dongjiangdao ⇄ Dongliliujinglu |
Other Metro
| Metro Network | Lines | Stations | |
|---|---|---|---|
| Shanghai Metro | 22 | 409 | |
| Beijing Subway | 25 | 406 | |
| Shenzhen Metro | 16 | 307 | |
| Chengdu Metro | 13 | 292 | |
| Wuhan Metro | 12 | 263 | |
| Chongqing Metro | 13 | 261 | |
| Hangzhou Metro | 14 | 261 | |
| Guangzhou Metro | 17 | 254 | |
| Nanjing Metro | 13 | 201 | |
| Xi'an Metro | 9 | 192 | |