Line 2 Info
- Network Hangzhou Metro
- Operation Started 2014
- Total Length 43.3 km
- Total Stations 33
Terminals
From
Chaoyang
To
Liangzhu
Line 2 Overview
Line 2 began construction in phases between Chaoyang and Qianjiang Road on November 24, 2014, and through subsequent extensions, the entire route was completed by 2017. The 42.8-kilometer line, with 33 stations, forms a major corridor from northwest to southeast in Hangzhou. It passes through central Hangzhou and connects key interchange points such as Fengqi Road, Wulinmen, and Qianjiang Century City.
Hangzhou Metro Map 2026
Click to expand
Other Lines in Hangzhou Metro
Line 1
Xianghu ↔ Xiaoshan International Airport
33 stations
Line 10
Yisheng Road ↔ Huanglong Sports Center
12 stations
Line 16
Jiuzhou Street ↔ Lvting Road
12 stations
Line 19
Tiaoxi ↔ Yongsheng Road
18 stations
Line 3
Wushanqiancun ↔ Xingqiao
35 stations
Line 3
Shima ↔ Xingqiao
28 stations
Line 4
Puyan ↔ Chihua Street
33 stations
Line 5
Jinxing ↔ Guniangqiao
39 stations
Line 6
Goujulong ↔ West Guihua Road
33 stations
Line 6
Goujulong ↔ Shuangpu
25 stations
Line 7
Wushan Square ↔ Jiangdong'er Road
24 stations
Line 8
South Wenhai Road ↔ Xinwan Road
9 stations
Frequently Asked Questions — Line 2
Line 2 has 33 stations on the Hangzhou Metro network.
Line 2 runs between Chaoyang and Liangzhu.
Line 2 is approximately 43.3 km long.
Line 2 opened in 2014.
Line 2 is a Metro line operated under Hangzhou Metro.
Line 2 is part of the Hangzhou Metro transit network.