Line 3 Info
- Network Hangzhou Metro
- Operation Started 2022
- Total Length 57.5 km
- Total Stations 28
Terminals
From
Shima
To
Xingqiao
Line 3 Overview
The branch line runs from the Shishi Wetland to stations around Shima and western Hangzhou. It serves as an extension of the main road and serves the western development and ecological areas of the city. This branch connects to the main line at major interchange stations, allowing passengers to transfer between both sections within the Line 3 system.
Hangzhou Metro Map 2026
Click to expand
Other Lines in Hangzhou Metro
Line 1
Xianghu ↔ Xiaoshan International Airport
33 stations
Line 10
Yisheng Road ↔ Huanglong Sports Center
12 stations
Line 16
Jiuzhou Street ↔ Lvting Road
12 stations
Line 19
Tiaoxi ↔ Yongsheng Road
18 stations
Line 2
Chaoyang ↔ Liangzhu
33 stations
Line 3
Wushanqiancun ↔ Xingqiao
35 stations
Line 4
Puyan ↔ Chihua Street
33 stations
Line 5
Jinxing ↔ Guniangqiao
39 stations
Line 6
Goujulong ↔ West Guihua Road
33 stations
Line 6
Goujulong ↔ Shuangpu
25 stations
Line 7
Wushan Square ↔ Jiangdong'er Road
24 stations
Line 8
South Wenhai Road ↔ Xinwan Road
9 stations
Frequently Asked Questions — Line 3
Line 3 has 28 stations on the Hangzhou Metro network.
Line 3 runs between Shima and Xingqiao.
Line 3 is approximately 57.5 km long.
Line 3 opened in 2022.
Line 3 is a Metro line operated under Hangzhou Metro.
Line 3 is part of the Hangzhou Metro transit network.