Line 6 Info
- Network Guangzhou Metro
- Operation Started 2013
- Total Length 41.7 km
- Total Stations 32
Terminals
From
Xunfenggang
To
Xiangxue
Line 6 Overview
Line 6 was opened in phases starting December 28, 2013. The line is 41.7 km long and has 32 stations, connecting major interchange stations with multiple metro lines. The second phase opened on December 28, 2016, and further stations were added to improve connectivity. It runs from Shunfenggang to Xiangxu, passing through districts such as Baiyun, Liwan, Yuxiu, Tianhe, and Huangpu.
Guangzhou Metro Map 2026
Click to expand
Other Lines in Guangzhou Metro
APM Line
Canton Tower ↔ Linhexi
9 stations
Line 1
Xilang ↔ Guangzhou East Railway Station
16 stations
Line 13
Yuzhu ↔ Xinsha
11 stations
Line 14
Jiahewanggang ↔ Dongfeng
13 stations
Line 14
Xinhe ↔ Zhenlong
10 stations
Line 18
Xiancun ↔ Wanqingsha
8 stations
Line 2
Guangzhou South Railway Station ↔ Jiahewanggang
24 stations
Line 21
Yuancun ↔ Zengcheng Square
21 stations
Line 22
Chentougang ↔ Panyu Square
4 stations
Line 3
Panyu Square ↔ Airport North (Terminal 2)
30 stations
Line 3
Panyu Square ↔ Tianhe Coach Terminal
16 stations
Line 4
Nansha Passenger Port ↔ Huangcun
24 stations
Frequently Asked Questions — Line 6
Line 6 has 32 stations on the Guangzhou Metro network.
Line 6 runs between Xunfenggang and Xiangxue.
Line 6 is approximately 41.7 km long.
Line 6 opened in 2013.
Line 6 is a Metro line operated under Guangzhou Metro.
Line 6 is part of the Guangzhou Metro transit network.