Line 13 Info
- Network Guangzhou Metro
- Operation Started 2017
- Total Length 28.3 km
- Total Stations 11
Terminals
From
Yuzhu
To
Xinsha
Line 13 Overview
Line 10 began operations on June 29, 2025, with the initial section between Xilang and Yangtze East. The line is 17.2 kilometers long and currently has 12 stations. Construction of the line began in 2018 and is designed as a rapid transit corridor connecting the western and central parts of the city. Additional sections and integration with other routes are planned as part of future network development.
Guangzhou Metro Map 2026
Click to expand
Other Lines in Guangzhou Metro
APM Line
Canton Tower ↔ Linhexi
9 stations
Line 1
Xilang ↔ Guangzhou East Railway Station
16 stations
Line 14
Jiahewanggang ↔ Dongfeng
13 stations
Line 14
Xinhe ↔ Zhenlong
10 stations
Line 18
Xiancun ↔ Wanqingsha
8 stations
Line 2
Guangzhou South Railway Station ↔ Jiahewanggang
24 stations
Line 21
Yuancun ↔ Zengcheng Square
21 stations
Line 22
Chentougang ↔ Panyu Square
4 stations
Line 3
Panyu Square ↔ Airport North (Terminal 2)
30 stations
Line 3
Panyu Square ↔ Tianhe Coach Terminal
16 stations
Line 4
Nansha Passenger Port ↔ Huangcun
24 stations
Line 5
Jiaokou ↔ Huangpu New Port
30 stations
Frequently Asked Questions — Line 13
Line 13 has 11 stations on the Guangzhou Metro network.
Line 13 runs between Yuzhu and Xinsha.
Line 13 is approximately 28.3 km long.
Line 13 opened in 2017.
Line 13 is a Metro line operated under Guangzhou Metro.
Line 13 is part of the Guangzhou Metro transit network.