Line 4 Info
- Network Guangzhou Metro
- Operation Started 2005
- Total Length 60.0 km
- Total Stations 24
Terminals
From
Nansha Passenger Port
To
Huangcun
Line 4 Overview
The first phase of Guangzhou Metro Line 4 opened on December 26, 2005 (Wanshengwei-Xinzhao) and was gradually extended southward to Nansha Passenger Port until 2017. The line runs from Huangcun to Nansha Passenger Port. It has interchange stations such as Wanshengwei (Line 8), Chebenan (Line 5), and Huangcun (Line 21).
Guangzhou Metro Map 2026
Click to expand
Other Lines in Guangzhou Metro
APM Line
Canton Tower ↔ Linhexi
9 stations
Line 1
Xilang ↔ Guangzhou East Railway Station
16 stations
Line 13
Yuzhu ↔ Xinsha
11 stations
Line 14
Jiahewanggang ↔ Dongfeng
13 stations
Line 14
Xinhe ↔ Zhenlong
10 stations
Line 18
Xiancun ↔ Wanqingsha
8 stations
Line 2
Guangzhou South Railway Station ↔ Jiahewanggang
24 stations
Line 21
Yuancun ↔ Zengcheng Square
21 stations
Line 22
Chentougang ↔ Panyu Square
4 stations
Line 3
Panyu Square ↔ Airport North (Terminal 2)
30 stations
Line 3
Panyu Square ↔ Tianhe Coach Terminal
16 stations
Line 5
Jiaokou ↔ Huangpu New Port
30 stations
Frequently Asked Questions — Line 4
Line 4 has 24 stations on the Guangzhou Metro network.
Line 4 runs between Nansha Passenger Port and Huangcun.
Line 4 is approximately 60.0 km long.
Line 4 opened in 2005.
Line 4 is a Metro line operated under Guangzhou Metro.
Line 4 is part of the Guangzhou Metro transit network.