Route Finder

Sembawang to Sengkang Metro Route

13 stations2 interchanges20 km~40 min
Change to Circle Line towards HarbourFront
Change to North East Line towards Punggol
  1. 1
    Start at Sembawang Metro Station.
  2. 2
    Board the North–South Line towards Marina South Pier
    Ride 6 stops to Bishan.
    Change lines here
  3. 3
    Board the Circle Line towards HarbourFront
    Ride 2 stops to Serangoon.
    Change lines here
  4. 4
    Board the North East Line towards Punggol
    Ride 4 stops to Sengkang.
  5. Arrive at Sengkang Metro Station. You have reached your destination.

Singapore MRT Map 2026

Singapore MRT map
Click to expand

Sembawang to Sengkang — Frequently Asked Questions

There are 13 stations on the route from Sembawang to Sengkang, including the origin and destination.

You need to make 2 interchanges to travel from Sembawang to Sengkang, using North–South Line and Circle Line and North East Line.

The distance from Sembawang to Sengkang is approximately 20 km by Metro.

The estimated journey time from Sembawang to Sengkang is approximately 40 minutes.

You can travel from Sembawang to Sengkang via North–South Line and Circle Line and North East Line on the Singapore MRT.

To travel in the reverse direction from Sengkang to Sembawang, follow the same route in the opposite direction. The journey takes approximately 40 minutes.
Origin Gates

Sembawang

Gate A Bus Interchange / Sun Plaza
Gate B Canberra Community Club
Gate C Sembawang Park / Hot Spring Park
Gate D Sembawang Shipyard
Destination Gates

Sengkang

Gate A Compass One / Sengkang Bus Interchange
Gate B Sengkang Sports Centre / Rivervale
Gate C Sengkang Riverside Park / Anchorvale
Gate D Sengkang General Hospital / Sengkang Community Hospital