Route Finder

Gul Circle to Lavender Metro Route

20 stations0 interchanges28 km~55 min
  1. 1
    Start at Gul Circle Metro Station.
  2. 2
    Board the East–West Line towards Pasir Ris
    Ride 19 stops to Lavender.
  3. Arrive at Lavender Metro Station. You have reached your destination.

Singapore MRT Map 2026

Singapore MRT map
Click to expand

Gul Circle to Lavender — Frequently Asked Questions

There are 20 stations on the route from Gul Circle to Lavender, including the origin and destination.

No, you can travel directly from Gul Circle to Lavender on the East–West Line without any line changes.

The distance from Gul Circle to Lavender is approximately 28 km by Metro.

The estimated journey time from Gul Circle to Lavender is approximately 55 minutes.

You can travel from Gul Circle to Lavender via East–West Line on the Singapore MRT.

To travel in the reverse direction from Lavender to Gul Circle, follow the same route in the opposite direction. The journey takes approximately 55 minutes.
Origin Gates

Gul Circle

Gate A Gul Circle / Tuas South
Gate B Tuas Avenue / Gul Way
Destination Gates

Lavender

Gate A Lavender MRT Bus Stop / Jalan Besar
Gate B City Square Mall / Jalan Besar
Gate C ICA Building / Kallang Road