Route Finder

Fort Canning to Lakeside Route

13 stations2 interchanges17 km~33 min
Board Downtown Line towards Expo
Change to North East Line towards Punggol
  1. 1
    Start at Fort Canning station.
  2. 2
    Board the Downtown Line towards Expo
    Ride 1 stop to Chinatown.
    Change lines here
  3. 3
    Board the North East Line towards Punggol
    Ride 1 stop to Outram Park.
    Change lines here
  4. 4
    Board the East–West Line towards Pasir Ris
    Ride 10 stops to Lakeside.
  5. Arrive at Lakeside station. You have reached your destination.
Origin

Fort Canning Singapore

Gates / Exits

Gate A Fort Canning Park / River Valley Road
Gate B Clarke Quay / River Valley
Gate C Fort Canning Park / Stamford Road
Destination

Lakeside Singapore

Gates / Exits

Gate A Lakeside MRT Bus Stop / Jurong West
Gate B Chinese Garden / Jurong Lake Gardens
Gate C Boon Lay Way / Jurong West

Fort Canning to Lakeside — Frequently Asked Questions

There are 13 stations on the route from Fort Canning to Lakeside, including the origin and destination.

You need to make 2 interchanges to travel from Fort Canning to Lakeside, using Downtown Line and North East Line and East–West Line.

The distance from Fort Canning to Lakeside is approximately 17 km by MRT.

The estimated journey time from Fort Canning to Lakeside is approximately 33 minutes.

You can travel from Fort Canning to Lakeside via Downtown Line and North East Line and East–West Line on the Singapore MRT.

To travel in the reverse direction from Lakeside to Fort Canning, follow the same route in the opposite direction. The journey takes approximately 33 minutes.

Singapore MRT Map 2026

Singapore MRT map
Click to expand