Route Finder

Esplanade to Tuas Link Metro Route

23 stations2 interchanges30 km~1h
Board Circle Line towards HarbourFront
Change to North East Line towards Punggol
  1. 1
    Start at Esplanade Metro Station.
  2. 2
    Board the Circle Line towards HarbourFront
    Ride 2 stops to Dhoby Ghaut.
    Change lines here
  3. 3
    Board the North East Line towards Punggol
    Ride 3 stops to Outram Park.
    Change lines here
  4. 4
    Board the East–West Line towards Pasir Ris
    Ride 17 stops to Tuas Link.
  5. Arrive at Tuas Link Metro Station. You have reached your destination.

Singapore MRT Map 2026

Singapore MRT map
Click to expand

Esplanade to Tuas Link — Frequently Asked Questions

There are 23 stations on the route from Esplanade to Tuas Link, including the origin and destination.

You need to make 2 interchanges to travel from Esplanade to Tuas Link, using Circle Line and North East Line and East–West Line.

The distance from Esplanade to Tuas Link is approximately 30 km by Metro.

The estimated journey time from Esplanade to Tuas Link is approximately 1 hour.

You can travel from Esplanade to Tuas Link via Circle Line and North East Line and East–West Line on the Singapore MRT.

To travel in the reverse direction from Tuas Link to Esplanade, follow the same route in the opposite direction. The journey takes approximately 1 hour.
Origin Gates

Esplanade

Gate A Suntec City / Raffles Boulevard
Gate B Esplanade – Theatres on the Bay
Gate C Marina Square / Millenia Walk
Destination Gates

Tuas Link

Gate A Tuas Link / Tuas Bus Terminal
Gate B Tuas Link Road / Tuas Checkpoint