Route Finder

Dover to Kembangan Route

17 stations0 interchanges18 km~37 min
  1. 1
    Start at Dover station.
  2. 2
    Board the East–West Line towards Pasir Ris
    Ride 16 stops to Kembangan.
  3. Arrive at Kembangan station. You have reached your destination.
Origin

Dover Singapore

Gates / Exits

Gate A Dover Road / Singapore Polytechnic
Gate B Singapore Polytechnic / Dover Crescent
Gate C The Metropolis / one-north
Destination

Kembangan Singapore

Gates / Exits

Gate A Kembangan Community Centre / Jalan Masjid
Gate B Jalan Eunos / Sims Avenue

Dover to Kembangan — Frequently Asked Questions

There are 17 stations on the route from Dover to Kembangan, including the origin and destination.

No, you can travel directly from Dover to Kembangan on the East–West Line without any line changes.

The distance from Dover to Kembangan is approximately 18 km by MRT.

The estimated journey time from Dover to Kembangan is approximately 37 minutes.

You can travel from Dover to Kembangan via East–West Line on the Singapore MRT.

To travel in the reverse direction from Kembangan to Dover, follow the same route in the opposite direction. The journey takes approximately 37 minutes.

Singapore MRT Map 2026

Singapore MRT map
Click to expand