Shiraz Metro Line 2
Network | Shiraz Metro |
Line | Line 2 |
Line length | 15 |
Opening date | 2023 |
Line type | Rapid transit |
Total station | 13 Active Stations |
Terminals | Ghahramanan ⇄ Ghahramanan |
Stations
Station | Layout | Operation starts | |
---|---|---|---|
▣ | Shokoufeh | 2023 | |
▣ | Ghahramanan | 2023 | |
▣ | Adelabad | 2023 | |
▣ | Dowlat | 2023 | |
▣ | Rahmat | 2023 | |
▣ | Basij | 2023 | |
▣ | Esteghlal | 2023 | |
▣ | 15-e Khordad | 2023 | |
▣ | Imam Hossein | 2019 | |
▣ | Azadi | 2023 | |
▣ | Atlasi | 2023 | |
▣ | Hafezieh | 2023 | |
▣ | Sa'adieh | 2023 |
Metro Map
Other Lines
Metro lines | Stations | Terminal stations | |
---|---|---|---|
▣ | Line 1 | 20 | Shahid Dastgheyb ⇄ Ehsan |
Other Metro
Metro Network | Lines | Stations | |
---|---|---|---|
Tehran Metro | 7 | 133 | |
Mashhad Urban Railway | 2 | 35 | |
Isfahan Metro | 1 | 20 | |
Tabriz Metro | 1 | 12 |