Kuala Lumpur Rapid Rail LRT Sri Petaling Line
| Network | Kuala Lumpur Rapid Rail |
| Line | LRT Sri Petaling Line |
| Line length | 45.1 |
| Opening date | 11 July 1998 |
| Line type | Rapid transit |
| Total station | 29 Active Stations |
| Terminals | Sentul Timur ⇄ Sentul Timur |
Stations
| Station | Layout | Operation starts | |
|---|---|---|---|
| ▣ | Sentul Timur | Elevated | |
| ▣ | Sentul | Elevated | |
| ▣ | Titiwangsa | Elevated | |
| ▣ | PWTC | Elevated | |
| ▣ | Sultan Ismail | Elevated | |
| ▣ | Bandaraya | Elevated | |
| ▣ | Masjid Jamek | Elevated | |
| ▣ | Plaza Rakyat | Elevated | |
| ▣ | Hang Tuah | Surface | |
| ▣ | Pudu | Elevated | |
| ▣ | Chan Sow Lin | Surface | |
| ▣ | Cheras | Surface | |
| ▣ | Salak Selatan | Surface | |
| ▣ | Bandar Tun Razak | Surface | |
| ▣ | Bandar Tasik Selatan | Surface | |
| ▣ | Sungai Besi | Elevated | |
| ▣ | Bukit Jalil | Elevated | |
| ▣ | Sri Petaling | Surface | |
| ▣ | Awan Besar | Elevated | |
| ▣ | Muhibbah | Elevated | |
| ▣ | Alam Sutera | Elevated | |
| ▣ | Kinrara BK5 | Elevated | |
| ▣ | IOI Puchong Jaya | Elevated | |
| ▣ | Pusat Bandar Puchong | Elevated | |
| ▣ | Taman Perindustrian Puchong | Elevated | |
| ▣ | Bandar Puteri | Elevated | |
| ▣ | Puchong Perdana | Elevated | |
| ▣ | Puchong Prima | Elevated | |
| ▣ | Putra Heights | Elevated | |
Metro Map
Other Lines
| Metro lines | Stations | Terminal stations | |
|---|---|---|---|
| ▣ | LRT Ampang Line | 18 | Sentul Timur ⇄ Ampang |
| ▣ | LRT Kelana Jaya Line | 37 | Gombak ⇄ Putra Heights |
| ▣ | KL Monorail | 11 | KL Sentral Monorail ⇄ Titiwangsa |
| ▣ | MRT Kajang Line | 29 | Kwasa Damansara ⇄ Kajang |
| ▣ | MRT Putrajaya Line | 36 | Kwasa Damansara ⇄ Putrajaya Sentral |
| ▣ | BRT Sunway Line | 7 | Sunway-Setia Jaya ⇄ USJ 7 |
Other Metro
No other netowrk.