Line 5 Info
- Network Changsha Metro
- Operation Started 2020
- Total Length 22.5 km
- Total Stations 18
Terminals
From
Maozhutang
To
Shuiduhe
Line 5 Overview
The first phase of Changsha Metro Line 5, which runs between Maozhutang and Shuiduhe and is 22.5 kilometers long and has 18 stations, was opened to the public on June 28, 2020, and includes interchange stations with other lines, forming an important north-south corridor in the eastern part of the network.
Changsha Metro Map 2026
Click to expand
Other Lines in Changsha Metro
Line 1
Kaifu District Government ↔ Shangshuangtang
20 stations
Line 2
West Meixi Lake ↔ Guangda
23 stations
Line 3
Xiangtan North Railway Station ↔ Guangsheng
33 stations
Line 4
Guanziling ↔ Dujiaping
25 stations
Line 6
Xiejiaqiao ↔ Huanghua Airport T1 & T2
34 stations
Xihuan Line
Xiangtan North Railway Station ↔ Dawangshan
8 stations
Frequently Asked Questions — Line 5
Line 5 has 18 stations on the Changsha Metro network.
Line 5 runs between Maozhutang and Shuiduhe.
Line 5 is approximately 22.5 km long.
Line 5 opened in 2020.
Line 5 is a Metro line operated under Changsha Metro.
Line 5 is part of the Changsha Metro transit network.