Line 4 Info
- Network Changsha Metro
- Operation Started 2019
- Total Length 33.5 km
- Total Stations 25
Terminals
From
Guanziling
To
Dujiaping
Line 4 Overview
The first phase of Changsha Metro Line 4, which runs between Guanziling and Dujiaping and is 33.5 kilometers long and has 25 stations, was opened to the public on May 26, 2019, and includes several interchange stations such as Yingwanzhen, Fubuhe, Huangtuling, Shawan Park, and Guitang.
Changsha Metro Map 2026
Click to expand
Other Lines in Changsha Metro
Line 1
Kaifu District Government ↔ Shangshuangtang
20 stations
Line 2
West Meixi Lake ↔ Guangda
23 stations
Line 3
Xiangtan North Railway Station ↔ Guangsheng
33 stations
Line 5
Maozhutang ↔ Shuiduhe
18 stations
Line 6
Xiejiaqiao ↔ Huanghua Airport T1 & T2
34 stations
Xihuan Line
Xiangtan North Railway Station ↔ Dawangshan
8 stations
Frequently Asked Questions — Line 4
Line 4 has 25 stations on the Changsha Metro network.
Line 4 runs between Guanziling and Dujiaping.
Line 4 is approximately 33.5 km long.
Line 4 opened in 2019.
Line 4 is a Metro line operated under Changsha Metro.
Line 4 is part of the Changsha Metro transit network.