Route Finder

Sengkang to Gul Circle Route

22 stations2 interchanges33 km~1h 7m
Board North East Line towards Punggol
  1. 1
    Start at Sengkang station.
  2. 2
    Board the North East Line towards Punggol
    Ride 4 stops to Serangoon.
    Change lines here
  3. 3
    Board the Circle Line towards HarbourFront
    Ride 8 stops to Buona Vista.
    Change lines here
  4. 4
    Board the East–West Line towards Pasir Ris
    Ride 9 stops to Gul Circle.
  5. Arrive at Gul Circle station. You have reached your destination.
Origin

Sengkang Singapore

Gates / Exits

Gate A Compass One / Sengkang Bus Interchange
Gate B Sengkang Sports Centre / Rivervale
Gate C Sengkang Riverside Park / Anchorvale
Gate D Sengkang General Hospital / Sengkang Community Hospital
Destination

Gul Circle Singapore

Gates / Exits

Gate A Gul Circle / Tuas South
Gate B Tuas Avenue / Gul Way

Sengkang to Gul Circle — Frequently Asked Questions

There are 22 stations on the route from Sengkang to Gul Circle, including the origin and destination.

You need to make 2 interchanges to travel from Sengkang to Gul Circle, using North East Line and Circle Line and East–West Line.

The distance from Sengkang to Gul Circle is approximately 33 km by MRT.

The estimated journey time from Sengkang to Gul Circle is approximately 1 hour 7 minutes.

You can travel from Sengkang to Gul Circle via North East Line and Circle Line and East–West Line on the Singapore MRT.

To travel in the reverse direction from Gul Circle to Sengkang, follow the same route in the opposite direction. The journey takes approximately 1 hour 7 minutes.

Singapore MRT Map 2026

Singapore MRT map
Click to expand