Route Finder

Sembawang to Tuas West Road Route

18 stations1 interchange31 km~1h 2m
  1. 1
    Start at Sembawang station.
  2. 2
    Board the North–South Line towards Marina South Pier
    Ride 9 stops to Jurong East.
    Change lines here
  3. 3
    Board the East–West Line towards Pasir Ris
    Ride 8 stops to Tuas West Road.
  4. Arrive at Tuas West Road station. You have reached your destination.
Origin

Sembawang Singapore

Gates / Exits

Gate A Bus Interchange / Sun Plaza
Gate B Canberra Community Club
Gate C Sembawang Park / Hot Spring Park
Gate D Sembawang Shipyard
Destination

Tuas West Road Singapore

Gates / Exits

Gate A Tuas West Road / Tuas View
Gate B Tuas West Road / Tuas South

More routes from Sembawang

More routes from Tuas West Road

Sembawang to Tuas West Road — Frequently Asked Questions

There are 18 stations on the route from Sembawang to Tuas West Road, including the origin and destination.

You need to make 1 interchange to travel from Sembawang to Tuas West Road, using North–South Line and East–West Line.

The distance from Sembawang to Tuas West Road is approximately 31 km by MRT.

The estimated journey time from Sembawang to Tuas West Road is approximately 1 hour 2 minutes.

You can travel from Sembawang to Tuas West Road via North–South Line and East–West Line on the Singapore MRT.

To travel in the reverse direction from Tuas West Road to Sembawang, follow the same route in the opposite direction. The journey takes approximately 1 hour 2 minutes.

Singapore MRT Map 2026

Singapore MRT map
Click to expand