Route Finder

Caldecott to Kembangan Metro Route

11 stations1 interchange12 km~23 min
Change to East–West Line towards Pasir Ris
  1. 1
    Start at Caldecott Metro Station.
  2. 2
    Board the Circle Line towards HarbourFront
    Ride 8 stops to Paya Lebar.
    Change lines here
  3. 3
    Board the East–West Line towards Pasir Ris
    Ride 2 stops to Kembangan.
  4. Arrive at Kembangan Metro Station. You have reached your destination.

Singapore MRT Map 2026

Singapore MRT map
Click to expand

More routes from Caldecott

More routes from Kembangan

Caldecott to Kembangan — Frequently Asked Questions

There are 11 stations on the route from Caldecott to Kembangan, including the origin and destination.

You need to make 1 interchange to travel from Caldecott to Kembangan, using Circle Line and East–West Line.

The distance from Caldecott to Kembangan is approximately 12 km by Metro.

The estimated journey time from Caldecott to Kembangan is approximately 23 minutes.

You can travel from Caldecott to Kembangan via Circle Line and East–West Line on the Singapore MRT.

To travel in the reverse direction from Kembangan to Caldecott, follow the same route in the opposite direction. The journey takes approximately 23 minutes.
Origin Gates

Caldecott

Gate A Caldecott Hill / Thomson Road
Gate B Toa Payoh Rise / Andrew Road
Gate C Rifle Range Road / Mount Pleasant Road
Destination Gates

Kembangan

Gate A Kembangan Community Centre / Jalan Masjid
Gate B Jalan Eunos / Sims Avenue