Route Finder

Bukit Gombak to Lorong Chuan Metro Route

13 stations2 interchanges20 km~39 min
Board North–South Line towards Marina South Pier
Change to East–West Line towards Pasir Ris
  1. 1
    Start at Bukit Gombak Metro Station.
  2. 2
    Board the North–South Line towards Marina South Pier
    Ride 2 stops to Jurong East.
    Change lines here
  3. 3
    Board the East–West Line towards Pasir Ris
    Ride 3 stops to Buona Vista.
    Change lines here
  4. 4
    Board the Circle Line towards HarbourFront
    Ride 7 stops to Lorong Chuan.
  5. Arrive at Lorong Chuan Metro Station. You have reached your destination.

Singapore MRT Map 2026

Singapore MRT map
Click to expand

Bukit Gombak to Lorong Chuan — Frequently Asked Questions

There are 13 stations on the route from Bukit Gombak to Lorong Chuan, including the origin and destination.

You need to make 2 interchanges to travel from Bukit Gombak to Lorong Chuan, using North–South Line and East–West Line and Circle Line.

The distance from Bukit Gombak to Lorong Chuan is approximately 20 km by Metro.

The estimated journey time from Bukit Gombak to Lorong Chuan is approximately 39 minutes.

You can travel from Bukit Gombak to Lorong Chuan via North–South Line and East–West Line and Circle Line on the Singapore MRT.

To travel in the reverse direction from Lorong Chuan to Bukit Gombak, follow the same route in the opposite direction. The journey takes approximately 39 minutes.
Origin Gates

Bukit Gombak

Gate A Little Guilin / Bukit Gombak
Gate B Guilin View / Town Park
Destination Gates

Lorong Chuan

Gate A Lorong Chuan / Serangoon Garden Way
Gate B Lorong Chuan / St Gabriel’s Avenue
Gate C Braddell Road / Serangoon Avenue 3