Line 2 Info
- Network Shenyang Metro
- Operation Started 2012
- Total Length 45.6 km
- Total Stations 33
Terminals
From
Putianlu
To
Taoxianjichang
Line 2 Overview
Line 2 was inaugurated on January 9, 2012, between Santazi and Quanyunlu. It was later extended northward to Putianlu in 2013 and 2018, while a southern extension to Taoxian Airport opened on September 29, 2023. It now runs between Putianlu and Taoxian Airport. The line is 45.58 kilometers long and has a total of 33 stations. Major interchange stations include Qingniandajie, Shenyang North Railway Station, and the Olympic Sports Center.
Shenyang Metro Map 2026
Click to expand
Frequently Asked Questions — Line 2
Line 2 has 33 stations on the Shenyang Metro network.
Line 2 runs between Putianlu and Taoxianjichang.
Line 2 is approximately 45.6 km long.
Line 2 opened in 2012.
Line 2 is a Metro line operated under Shenyang Metro.
Line 2 is part of the Shenyang Metro transit network.