Panama Metro El Ramal
| Network | Panama Metro |
| Line | El Ramal |
| Opening date | 16 March 2023 |
| Line type | Rapid Transit |
| Total station | 3 Active Stations |
| Terminals | Corredor Sur ⇄ Corredor Sur |
Stations
| Station | Layout | Operation starts | |
|---|---|---|---|
| ▣ | Corredor Sur | ||
| ▣ | ITSE | ||
| ▣ | Aeropuerto | ||
Metro Map
Other Lines
| Metro lines | Stations | Terminal stations | |
|---|---|---|---|
| ▣ | Line 1 | 14 | San Isidro ⇄ Albrook |
| ▣ | Line 2 | 16 | San Miguelito 2 ⇄ Nuevo Tocumen |
Other Metro
No other netowrk.