Tabriz Metro (Tabriz Urban and Suburban Railway)

Tabriz Metro is a rapid transit system that serves the city of Tabriz, located in the northwestern region of Iran. It is a rapid transit system. The first phase started on 28 August 2015 with 7 km length and 6 stations. The second phase opened in 2016 and extended from Ostad Shahriyar station in the west to Medan-e Saat station. The line was finally completed in February 2020 with a further western extension and now runs 17.2 km from El Goli to Nour with 12 stations. With its well-designed infrastructure and commitment to service, the Tabriz Metro makes a significant contribution to enhancing public transportation in the region, providing a reliable and time-efficient mode of travel for Tabriz's growing population.

OperatorTabriz Municipality
Operation start27 August 2015
Total Lines1 Metro Lines
Total Station12 Active Stations
Metro City/CountryTabriz Iran
Official Webhttp://tabrizmetro.ir/

StationLayoutOperation starts
El Goli27 August 2015
Sahand27 August 2015
Emam Reza27 August 2015
Khayyam27 August 2015
29 Bahman27 August 2015
Ostad Shahriar27 August 2015
Daneshgah13 September 2017
Abresan25 September 2016
Shahid Behesthi25 September 2016
Meydan-e Sa'at25 September 2016
Meydan-e Kohan
Noor