Adana Metro (Adana metrosu)

Adana Metro is a rail rapid transit system that extends 13.5 kilometers (8.39 mi) along a north–south corridor through Adana with 13 stations. It can carry 21,600 passengers per hour per direction. The total travel time from start to finish on the metro is 21 minutes, including all stops. It does not operate 24 hours a day, its operating hours are from 6:00 am to 11:30 pm. The metro does not have air conditioning and passengers cannot walk between platforms. There are no driverless trains and no screen doors on the platforms. Adana Metro has been very well received by the city's population and has proven to be a great success. The new section will extend towards the north-east of the city, include 7 new stations and have a length of 9.3 km. This extension will take the total length of the system to 22.3 km and serve 20 stations.

Operator
Operation start18 March 2009
Total Lines1 Metro Lines
Total Station13 Active Stations
Metro City/CountryAdana Turkey
Official Webhttps://web.archive.org/web/20170412041839/http://www.adana.bel.tr/metro/

StationLayoutOperation starts
HastaneUnderground
Anadolu LisesiUnderground
HuzureviGround
Mavi BulvarGround
YurtGround
YeşilyurtGround
FatihElevated
VilayetUnderground
İstiklalUnderground
KocavezirElevated
HürriyetElevated
CumhuriyetElevated
AkıncılarElevated