Adana Metro (Adana metrosu)
Adana Metro is a rail rapid transit system that extends 13.5 kilometers (8.39 mi) along a north–south corridor through Adana with 13 stations. It can carry 21,600 passengers per hour per direction. The total travel time from start to finish on the metro is 21 minutes, including all stops. It does not operate 24 hours a day, its operating hours are from 6:00 am to 11:30 pm. The metro does not have air conditioning and passengers cannot walk between platforms. There are no driverless trains and no screen doors on the platforms. Adana Metro has been very well received by the city's population and has proven to be a great success. The new section will extend towards the north-east of the city, include 7 new stations and have a length of 9.3 km. This extension will take the total length of the system to 22.3 km and serve 20 stations.
Operator | |
Operation start | 18 March 2009 |
Total Lines | 1 Metro Lines |
Total Station | 13 Active Stations |
Metro City/Country | Adana Turkey |
Official Web | https://web.archive.org/web/20170412041839/http://www.adana.bel.tr/metro/ |
Station | Layout | Operation starts | |
---|---|---|---|
▣ | Hastane | Underground | |
▣ | Anadolu Lisesi | Underground | |
▣ | Huzurevi | Ground | |
▣ | Mavi Bulvar | Ground | |
▣ | Yurt | Ground | |
▣ | Yeşilyurt | Ground | |
▣ | Fatih | Elevated | |
▣ | Vilayet | Underground | |
▣ | İstiklal | Underground | |
▣ | Kocavezir | Elevated | |
▣ | Hürriyet | Elevated | |
▣ | Cumhuriyet | Elevated | |
▣ | Akıncılar | Elevated |