Route Finder

UET to Khatam-e-Nabuwat Metro Route

First & Last Train

From UET

First train 6:12 AM
Last train 10:10 AM

From Khatam-e-Nabuwat (return)

First train 6:13 AM
Last train 10:14 AM
12 stations0 interchanges11 km~23 min
  1. 1
    Start at UET Metro Station.
  2. 2
    Board the Lahore Orange Line towards Dera Gujran · from Platform 1
    Ride 11 stops to Khatam-e-Nabuwat.
  3. Arrive at Khatam-e-Nabuwat Metro Station. You have reached your destination.

Lahore Metro Map 2026

Lahore Metro map
Click to expand

UET to Khatam-e-Nabuwat — Frequently Asked Questions

There are 12 stations on the route from UET to Khatam-e-Nabuwat, including the origin and destination.

No, you can travel directly from UET to Khatam-e-Nabuwat on the Lahore Orange Line without any line changes.

The distance from UET to Khatam-e-Nabuwat is approximately 11 km by Metro.

The estimated journey time from UET to Khatam-e-Nabuwat is approximately 23 minutes.

You can travel from UET to Khatam-e-Nabuwat via Lahore Orange Line on the Lahore Metro.

To travel in the reverse direction from Khatam-e-Nabuwat to UET, follow the same route in the opposite direction. The journey takes approximately 23 minutes.

First & Last Train

From UET

First train 6:12 AM
Last train 10:10 AM

From Khatam-e-Nabuwat (return)

First train 6:13 AM
Last train 10:14 AM
Origin Gates

UET

Gate No. 1 GT Road / Mughalpura
Gate No. 2 GT Road / Mughalpura
Destination Gates

Khatam-e-Nabuwat

Gate No. 1 Block A / Sabzazar Housing Scheme / Allama Iqbal Town
Gate No. 2 Block A / Sabzazar Housing Scheme / Allama Iqbal Town