Route Finder

Taman Equine to Chow Kit Route

First & Last Train

From Taman Equine

First train 6:10 AM
Last train 11:45 PM

From Chow Kit (return)

First train 6:02 AM
Last train 11:58 PM
17 stations2 interchanges24 km~49 min
Change to LRT Ampang Line towards Ampang
  1. 1
    Start at Taman Equine Station.
  2. 2
    Board the MRT Putrajaya Line towards Putrajaya Sentral
    Ride 8 stops to Chan Sow Lin.
    Change lines here
  3. 3
    Board the LRT Ampang Line towards Ampang
    Ride 2 stops to Hang Tuah.
    Change lines here
  4. 4
    Board the KL Monorail towards Titiwangsa · from Platform 1
    Ride 6 stops to Chow Kit.
  5. Arrive at Chow Kit Station. You have reached your destination.

Kuala Lumpur Rapid Rail Map 2026 SVG

Kuala Lumpur Rapid Rail map
Click to expand

Taman Equine to Chow Kit — Frequently Asked Questions

There are 17 stations on the route from Taman Equine to Chow Kit, including the origin and destination.

You need to make 2 interchanges to travel from Taman Equine to Chow Kit, using MRT Putrajaya Line and LRT Ampang Line and KL Monorail.

The distance from Taman Equine to Chow Kit is approximately 24 km by Transit.

The estimated journey time from Taman Equine to Chow Kit is approximately 49 minutes.

You can travel from Taman Equine to Chow Kit via MRT Putrajaya Line and LRT Ampang Line and KL Monorail on the Kuala Lumpur Rapid Rail.

To travel in the reverse direction from Chow Kit to Taman Equine, follow the same route in the opposite direction. The journey takes approximately 49 minutes.

First & Last Train

From Taman Equine

First train 6:10 AM
Last train 11:45 PM

From Chow Kit (return)

First train 6:02 AM
Last train 11:58 PM
Origin Gates

Taman Equine

Gate A Taman Equine / Jalan Equine
Gate B The Mines / Seri Kembangan
Destination Gates

Chow Kit

Gate A West side of Jalan Tuanku Abdul Rahman
Gate B Jalan Raja Muda Abdul Aziz