Route Finder

Sentul Timur to Pavilion Kuala Lumpur–Bukit Bintang Route

First & Last Train

From Sentul Timur

First train 6:00 AM
Last train 11:53 PM

From Pavilion Kuala Lumpur–Bukit Bintang (return)

First train 6:45 AM
Last train 12:13 AM
10 stations2 interchanges7.6 km~15 min
Change to LRT Kelana Jaya Line towards Putra Heights
Change to MRT Kajang Line Platform 1 towards Kajang
  1. 1
    Start at Sentul Timur Station.
  2. 2
    Board the LRT Ampang Line towards Ampang
    Ride 6 stops to Masjid Jamek.
    Change lines here
  3. 3
    Board the LRT Kelana Jaya Line towards Putra Heights
    Ride 1 stop to Pasar Seni.
    Change lines here
  4. 4
    Board the MRT Kajang Line towards Kajang · from Platform 1
    Ride 2 stops to Pavilion Kuala Lumpur–Bukit Bintang.
  5. Arrive at Pavilion Kuala Lumpur–Bukit Bintang Station. You have reached your destination.

Kuala Lumpur Rapid Rail Map 2026 SVG

Kuala Lumpur Rapid Rail map
Click to expand

Sentul Timur to Pavilion Kuala Lumpur–Bukit Bintang — Frequently Asked Questions

There are 10 stations on the route from Sentul Timur to Pavilion Kuala Lumpur–Bukit Bintang, including the origin and destination.

You need to make 2 interchanges to travel from Sentul Timur to Pavilion Kuala Lumpur–Bukit Bintang, using LRT Ampang Line and LRT Kelana Jaya Line and MRT Kajang Line.

The distance from Sentul Timur to Pavilion Kuala Lumpur–Bukit Bintang is approximately 7.6 km by Transit.

The estimated journey time from Sentul Timur to Pavilion Kuala Lumpur–Bukit Bintang is approximately 15 minutes.

You can travel from Sentul Timur to Pavilion Kuala Lumpur–Bukit Bintang via LRT Ampang Line and LRT Kelana Jaya Line and MRT Kajang Line on the Kuala Lumpur Rapid Rail.

To travel in the reverse direction from Pavilion Kuala Lumpur–Bukit Bintang to Sentul Timur, follow the same route in the opposite direction. The journey takes approximately 15 minutes.

First & Last Train

From Sentul Timur

First train 6:00 AM
Last train 11:53 PM

From Pavilion Kuala Lumpur–Bukit Bintang (return)

First train 6:45 AM
Last train 12:13 AM
Origin Gates

Sentul Timur

Gate C SMK Bandar Baru Sentul / Taman Dato Senu / Masjid Raudhatul Muttaqin
Destination Gates

Pavilion Kuala Lumpur–Bukit Bintang

Gate A Changkat Bukit Bintang / Shoplots / Jalan Alor
Gate C Bukit Bintang Monorail Northwest entrance / Low Yat Plaza / Yayasan Selangor
Gate D Bukit Bintang Monorail Northeast entrance / Lot 10 / Fahrenheit 88 / The Starhill / Pavilion Kuala Lumpur