Route Finder

Mutiara Damansara to USJ21 Route

First & Last Train

From Mutiara Damansara

First train 6:12 AM
Last train 11:47 PM

From USJ21 (return)

First train 6:07 AM
Last train 11:27 PM
28 stations1 interchange36 km~1h 12m
  1. 1
    Start at Mutiara Damansara Station.
  2. 2
    Board the MRT Kajang Line towards Kajang · from Platform 1
    Ride 7 stops to Pasar Seni.
    Change lines here
  3. 3
    Board the LRT Kelana Jaya Line towards Putra Heights
    Ride 20 stops to USJ21.
  4. Arrive at USJ21 Station. You have reached your destination.

Kuala Lumpur Rapid Rail Map 2026 SVG

Kuala Lumpur Rapid Rail map
Click to expand

More routes from USJ21

Mutiara Damansara to USJ21 — Frequently Asked Questions

There are 28 stations on the route from Mutiara Damansara to USJ21, including the origin and destination.

You need to make 1 interchange to travel from Mutiara Damansara to USJ21, using MRT Kajang Line and LRT Kelana Jaya Line.

The distance from Mutiara Damansara to USJ21 is approximately 36 km by Transit.

The estimated journey time from Mutiara Damansara to USJ21 is approximately 1 hour 12 minutes.

You can travel from Mutiara Damansara to USJ21 via MRT Kajang Line and LRT Kelana Jaya Line on the Kuala Lumpur Rapid Rail.

To travel in the reverse direction from USJ21 to Mutiara Damansara, follow the same route in the opposite direction. The journey takes approximately 1 hour 12 minutes.

First & Last Train

From Mutiara Damansara

First train 6:12 AM
Last train 11:47 PM

From USJ21 (return)

First train 6:07 AM
Last train 11:27 PM
Origin Gates

Mutiara Damansara

Gate A Feeder bus stop / Dataran Bandar Utama / Persiaran Bukit Utama / SMK Bandar Utama Damansara 4
Gate B Feeder bus stop / Royale Chulan Hotel main lobby
Gate C Feeder bus stop / Mutiara Damansara
Gate D Surian Link / Surian Tower / Royale Chulan Hotel / The Curve / IPC Shopping Centre / Lotus's Mutiara Damansara
Destination Gates

USJ21

Gate A 19 USJ City Mall / Rhytme Avenue Residence
Gate B Main Place Mall / Main Place Residence