Route Finder

Kwasa Sentral to Kerinchi Route

First & Last Train

From Kwasa Sentral

First train 6:03 AM
Last train 11:39 PM

From Kerinchi (return)

First train 6:53 AM
Last train 12:06 AM
15 stations1 interchange23 km~46 min
  1. 1
    Start at Kwasa Sentral Station.
  2. 2
    Board the MRT Kajang Line towards Kajang · from Platform 1
    Ride 10 stops to Pasar Seni.
    Change lines here
  3. 3
    Board the LRT Kelana Jaya Line towards Putra Heights
    Ride 4 stops to Kerinchi.
  4. Arrive at Kerinchi Station. You have reached your destination.

Kuala Lumpur Rapid Rail Map 2026 SVG

Kuala Lumpur Rapid Rail map
Click to expand

More routes from Kwasa Sentral

More routes from Kerinchi

Kwasa Sentral to Kerinchi — Frequently Asked Questions

There are 15 stations on the route from Kwasa Sentral to Kerinchi, including the origin and destination.

You need to make 1 interchange to travel from Kwasa Sentral to Kerinchi, using MRT Kajang Line and LRT Kelana Jaya Line.

The distance from Kwasa Sentral to Kerinchi is approximately 23 km by Transit.

The estimated journey time from Kwasa Sentral to Kerinchi is approximately 46 minutes.

You can travel from Kwasa Sentral to Kerinchi via MRT Kajang Line and LRT Kelana Jaya Line on the Kuala Lumpur Rapid Rail.

To travel in the reverse direction from Kerinchi to Kwasa Sentral, follow the same route in the opposite direction. The journey takes approximately 46 minutes.

First & Last Train

From Kwasa Sentral

First train 6:03 AM
Last train 11:39 PM

From Kerinchi (return)

First train 6:53 AM
Last train 12:06 AM
Origin Gates

Kwasa Sentral

Gate A Feeder bus stop / Taxi and private vehicle lay-by / Park and Ride
Gate B Currently closed
Destination Gates

Kerinchi

Gate A Bangsar Trade Centre / Bangsar South via pedestrian bridge across Federal Highway