Route Finder

Kwasa Damansara to Kerinchi Route

First & Last Train

From Kwasa Damansara

First train 6:00 AM
Last train 11:36 PM

From Kerinchi (return)

First train 6:53 AM
Last train 12:06 AM
16 stations1 interchange24 km~48 min
  1. 1
    Start at Kwasa Damansara Station.
  2. 2
    Board the MRT Kajang Line towards Kajang · from Platform 1
    Ride 11 stops to Pasar Seni.
    Change lines here
  3. 3
    Board the LRT Kelana Jaya Line towards Putra Heights
    Ride 4 stops to Kerinchi.
  4. Arrive at Kerinchi Station. You have reached your destination.

Kuala Lumpur Rapid Rail Map 2026 SVG

Kuala Lumpur Rapid Rail map
Click to expand

More routes from Kwasa Damansara

More routes from Kerinchi

Kwasa Damansara to Kerinchi — Frequently Asked Questions

There are 16 stations on the route from Kwasa Damansara to Kerinchi, including the origin and destination.

You need to make 1 interchange to travel from Kwasa Damansara to Kerinchi, using MRT Kajang Line and LRT Kelana Jaya Line.

The distance from Kwasa Damansara to Kerinchi is approximately 24 km by Transit.

The estimated journey time from Kwasa Damansara to Kerinchi is approximately 48 minutes.

You can travel from Kwasa Damansara to Kerinchi via MRT Kajang Line and LRT Kelana Jaya Line on the Kuala Lumpur Rapid Rail.

To travel in the reverse direction from Kerinchi to Kwasa Damansara, follow the same route in the opposite direction. The journey takes approximately 48 minutes.

First & Last Train

From Kwasa Damansara

First train 6:00 AM
Last train 11:36 PM

From Kerinchi (return)

First train 6:53 AM
Last train 12:06 AM
Origin Gates

Kwasa Damansara

Gate A Taxi and private vehicle lay-by / Park N' Ride
Destination Gates

Kerinchi

Gate A Bangsar Trade Centre / Bangsar South via pedestrian bridge across Federal Highway