Route Finder

KL Sentral to Tun Razak Exchange (TRX) Route

7 stations2 interchanges6.2 km~12 min
Board KL Monorail Platform 1 towards Titiwangsa
Change to LRT Ampang Line Platform 2 towards Ampang
Change to MRT Putrajaya Line Platform 3 towards Putrajaya Sentral
  1. 1
    Start at KL Sentral station.
  2. 2
    Board the KL Monorail towards Titiwangsa · from Platform 1
    Ride 3 stops to Hang Tuah.
    Change lines here
  3. 3
    Board the LRT Ampang Line towards Ampang · from Platform 2
    Ride 2 stops to Chan Sow Lin.
    Change lines here
  4. 4
    Board the MRT Putrajaya Line towards Putrajaya Sentral · from Platform 3
    Ride 1 stop to Tun Razak Exchange (TRX).
  5. Arrive at Tun Razak Exchange (TRX) station. You have reached your destination.
Origin

KL Sentral Kuala Lumpur

Gates / Exits

Gate A NU Sentral Mall / KL Sentral transport hub / KTM / ERL / LRT connections
Destination

Tun Razak Exchange (TRX) Kuala Lumpur

Gates / Exits

Gate A Jalan Delima / Jalan Kamuning / Jalan Inai / The Exchange 106 / The Exchange TRX / TRX MRT Link
Gate B Jalan Tun Razak / Persiaran TRX Timur / feeder bus stop / taxi & kiss-and-ride lay-by / TREC
Gate C Linkway to The Exchange TRX Shopping Mall

KL Sentral to Tun Razak Exchange (TRX) — Frequently Asked Questions

There are 7 stations on the route from KL Sentral to Tun Razak Exchange (TRX), including the origin and destination.

You need to make 2 interchanges to travel from KL Sentral to Tun Razak Exchange (TRX), using KL Monorail and LRT Ampang Line and MRT Putrajaya Line.

The distance from KL Sentral to Tun Razak Exchange (TRX) is approximately 6.2 km by transit.

The estimated journey time from KL Sentral to Tun Razak Exchange (TRX) is approximately 12 minutes.

You can travel from KL Sentral to Tun Razak Exchange (TRX) via KL Monorail and LRT Ampang Line and MRT Putrajaya Line on the Kuala Lumpur Rapid Rail.

To travel in the reverse direction from Tun Razak Exchange (TRX) to KL Sentral, follow the same route in the opposite direction. The journey takes approximately 12 minutes.

Kuala Lumpur Rapid Rail Map 2026 SVG

Kuala Lumpur Rapid Rail map
Click to expand