Route Finder

Hikawadai to Nijūbashimae Route

13 stations2 interchanges1.2 km~2 min
Change to Tōzai Line Platform 1 towards Nishi-Funabashi
Change to Chiyoda Line Platform 3 towards Ayase
  1. 1
    Start at Hikawadai station.
  2. 2
    Board the Yūrakuchō Line towards Shin-kiba · from Platform 1
    Ride 8 stops to Iidabashi.
    Change lines here
  3. 3
    Board the Tōzai Line towards Nishi-Funabashi · from Platform 1
    Ride 3 stops to Ōtemachi.
    Change lines here
  4. 4
    Board the Chiyoda Line towards Ayase · from Platform 3
    Ride 1 stop to Nijūbashimae.
  5. Arrive at Nijūbashimae station. You have reached your destination.
Origin

Hikawadai Tokyo

Gates / Exits

Gate No. A1 Otemachi Financial City
Gate No. A2 NTT Otemachi Building
Gate No. Gate ? Exit 1 Exit 1
Gate No. Gate ? Exit 2 Exit 2
Destination

Nijūbashimae Tokyo

Gates / Exits

Gate No. 5 Inside Mitsubishi Corporation Building
Gate No. 3 Inside Marunouchi MY PLAZA
Gate No. 1 Exit 1
Gate No. 4 Exit 4
Gate No. 7 Exit 7

Hikawadai to Nijūbashimae — Frequently Asked Questions

There are 13 stations on the route from Hikawadai to Nijūbashimae, including the origin and destination.

You need to make 2 interchanges to travel from Hikawadai to Nijūbashimae, using Yūrakuchō Line and Tōzai Line and Chiyoda Line.

The distance from Hikawadai to Nijūbashimae is approximately 1.2 km by transit.

The estimated journey time from Hikawadai to Nijūbashimae is approximately 2 minutes.

You can travel from Hikawadai to Nijūbashimae via Yūrakuchō Line and Tōzai Line and Chiyoda Line on the Tokyo Metro.

To travel in the reverse direction from Nijūbashimae to Hikawadai, follow the same route in the opposite direction. The journey takes approximately 2 minutes.

Tokyo Metro Map 2026

Tokyo Metro map
Click to expand