Route Finder

Chow Kit to AEON–Maluri Route

10 stations2 interchanges8.4 km~17 min
Board KL Monorail towards Titiwangsa
Change to MRT Kajang Line Platform 1 towards Kajang
  1. 1
    Start at Chow Kit station.
  2. 2
    Board the KL Monorail towards Titiwangsa
    Ride 1 stop to Titiwangsa.
    Change lines here
  3. 3
    Board the MRT Putrajaya Line towards Putrajaya Sentral
    Ride 6 stops to Tun Razak Exchange (TRX).
    Change lines here
  4. 4
    Board the MRT Kajang Line towards Kajang · from Platform 1
    Ride 2 stops to AEON–Maluri.
  5. Arrive at AEON–Maluri station. You have reached your destination.
Origin

Chow Kit Kuala Lumpur

Gates / Exits

Gate A West side of Jalan Tuanku Abdul Rahman
Gate B Jalan Raja Muda Abdul Aziz
Destination

AEON–Maluri Kuala Lumpur

Gates / Exits

Gate A Jalan Cheras / AEON Taman Maluri / Taman Maluri
Gate B Sunway Velocity Shopping Complex / Jalan Lombong / Jalan Galian
Gate C LRT–MRT Linkway
Gate D Jalan Cheras / Bandar Sri Permaisuri side

Chow Kit to AEON–Maluri — Frequently Asked Questions

There are 10 stations on the route from Chow Kit to AEON–Maluri, including the origin and destination.

You need to make 2 interchanges to travel from Chow Kit to AEON–Maluri, using KL Monorail and MRT Putrajaya Line and MRT Kajang Line.

The distance from Chow Kit to AEON–Maluri is approximately 8.4 km by transit.

The estimated journey time from Chow Kit to AEON–Maluri is approximately 17 minutes.

You can travel from Chow Kit to AEON–Maluri via KL Monorail and MRT Putrajaya Line and MRT Kajang Line on the Kuala Lumpur Rapid Rail.

To travel in the reverse direction from AEON–Maluri to Chow Kit, follow the same route in the opposite direction. The journey takes approximately 17 minutes.

Kuala Lumpur Rapid Rail Map 2026 SVG

Kuala Lumpur Rapid Rail map
Click to expand