Route Finder

Bukit Bintang to Bank Rakyat–Bangsar Route

8 stations2 interchanges5.7 km~11 min
Board KL Monorail Platform 1 towards Titiwangsa
Change to LRT Ampang Line towards Ampang
Change to LRT Kelana Jaya Line towards Putra Heights
  1. 1
    Start at Bukit Bintang station.
  2. 2
    Board the KL Monorail towards Titiwangsa · from Platform 1
    Ride 2 stops to Hang Tuah.
    Change lines here
  3. 3
    Board the LRT Ampang Line towards Ampang
    Ride 2 stops to Masjid Jamek.
    Change lines here
  4. 4
    Board the LRT Kelana Jaya Line towards Putra Heights
    Ride 3 stops to Bank Rakyat–Bangsar.
  5. Arrive at Bank Rakyat–Bangsar station. You have reached your destination.
Origin

Bukit Bintang Kuala Lumpur

Gates / Exits

Gate A West side of Jalan Sultan Ismail / Low Yat Plaza / Bukit Bintang MRT C
Gate B Sungei Wang–Lot 10 pedestrian linkway / Sungei Wang Plaza / Lot 10
Gate C East side of Jalan Sultan Ismail / Starhill Gallery / Pavilion Kuala Lumpur / Bukit Bintang MRT D
Gate D Direct access to Lot 10
Gate E Sungei Wang–Lot 10 pedestrian linkway / Sungei Wang Plaza
Destination

Bank Rakyat–Bangsar Kuala Lumpur

Gates / Exits

Gate A Jalan Bangsar / Bangsar area / Bank Rakyat–Bangsar

Bukit Bintang to Bank Rakyat–Bangsar — Frequently Asked Questions

There are 8 stations on the route from Bukit Bintang to Bank Rakyat–Bangsar, including the origin and destination.

You need to make 2 interchanges to travel from Bukit Bintang to Bank Rakyat–Bangsar, using KL Monorail and LRT Ampang Line and LRT Kelana Jaya Line.

The distance from Bukit Bintang to Bank Rakyat–Bangsar is approximately 5.7 km by transit.

The estimated journey time from Bukit Bintang to Bank Rakyat–Bangsar is approximately 11 minutes.

You can travel from Bukit Bintang to Bank Rakyat–Bangsar via KL Monorail and LRT Ampang Line and LRT Kelana Jaya Line on the Kuala Lumpur Rapid Rail.

To travel in the reverse direction from Bank Rakyat–Bangsar to Bukit Bintang, follow the same route in the opposite direction. The journey takes approximately 11 minutes.

Kuala Lumpur Rapid Rail Map 2026 SVG

Kuala Lumpur Rapid Rail map
Click to expand