Route Finder

Bandar Tun Razak to Kepong Baru Route

First & Last Train

From Bandar Tun Razak

First train 6:42 AM
Last train 12:11 AM

From Kepong Baru (return)

First train 6:15 AM
Last train 11:56 PM
19 stations1 interchange18 km~36 min
  1. 1
    Start at Bandar Tun Razak Station.
  2. 2
    Board the LRT Sri Petaling Line towards Putra Heights
    Ride 11 stops to Titiwangsa.
    Change lines here
  3. 3
    Board the MRT Putrajaya Line towards Putrajaya Sentral
    Ride 7 stops to Kepong Baru.
  4. Arrive at Kepong Baru Station. You have reached your destination.

Kuala Lumpur Rapid Rail Map 2026 SVG

Kuala Lumpur Rapid Rail map
Click to expand

More routes from Bandar Tun Razak

More routes from Kepong Baru

Bandar Tun Razak to Kepong Baru — Frequently Asked Questions

There are 19 stations on the route from Bandar Tun Razak to Kepong Baru, including the origin and destination.

You need to make 1 interchange to travel from Bandar Tun Razak to Kepong Baru, using LRT Sri Petaling Line and MRT Putrajaya Line.

The distance from Bandar Tun Razak to Kepong Baru is approximately 18 km by Transit.

The estimated journey time from Bandar Tun Razak to Kepong Baru is approximately 36 minutes.

You can travel from Bandar Tun Razak to Kepong Baru via LRT Sri Petaling Line and MRT Putrajaya Line on the Kuala Lumpur Rapid Rail.

To travel in the reverse direction from Kepong Baru to Bandar Tun Razak, follow the same route in the opposite direction. The journey takes approximately 36 minutes.

First & Last Train

From Bandar Tun Razak

First train 6:42 AM
Last train 12:11 AM

From Kepong Baru (return)

First train 6:15 AM
Last train 11:56 PM
Origin Gates

Bandar Tun Razak

Gate A Bandar Tun Razak / Persiaran Ikhlas / Taman Mulia / southern fringe of Bandar Sri Permaisuri
Destination Gates

Kepong Baru

Gate A Jalan Kepong / Kepong Baru