16 stations1 interchange24 km~49 min
Board
MRT Putrajaya Line
towards Putrajaya Sentral
Change to
LRT Sri Petaling Line
towards Putra Heights
- 1
-
2
Board the MRT Putrajaya Line towards Putrajaya Sentral
Ride 7 stops to Sungai Besi.Change lines here -
3
Board the LRT Sri Petaling Line towards Putra Heights
Ride 8 stops to Pusat Bandar Puchong.
Origin
Ampang Park Kuala Lumpur
Gates / Exits
Gate A
North side of Jalan Ampang / Ampang Park MRT station (B)
Gate B
South side of Jalan Ampang / Jalan Tun Razak pedestrian walkway / Intermark Mall / The LINC
Destination
Pusat Bandar Puchong Kuala Lumpur
Gates / Exits
Gate A
Jalan Bandar Tiga / Lotus's Puchong / Bandar Puchong / Taman Mutiara Puchong
Gate B
Jalan Bandar 1 / Setia Walk / Taman Wawasan
More routes from Ampang Park
Sungai Besi